Soo Locks Closure 2024


Soo Locks Closure 2024. The soo locks in sault ste. On march 22, marking the start of the 2024 great lakes shipping.


Soo Locks Closure 2024

Army corps of engineers announced on thursday that the soo locks will close to all marine traffic on monday, january 15. On december 17 through april 24, 2024, to perform dam safety inspections and routine.

Marys River, Being The Last Freighter Through The Soo Locks At Around 9:45 Tuesday.

Ongoing new lock at the soo construction activities are occurring in the st.

The Soo Locks Will Now Close For More Than Two Months As Crews Perform Annual Seasonal Maintenance.

17, 2023, through april 24, 2024, to perform dam safety inspections and routine.

The Soo Locks In Sault Ste.

Images References :

The Soo Locks Will Open The Poe Lock To All Marine Traffic At 6 P.m.

Marys falls canal hydroelectric power plant tailrace.

The Soo Locks’ Macarthur Lock Will Close For The Navigation Season 7 A.m.

On march 22, marking the start of the 2024 great lakes shipping.

Marie, Mich., Will Open The Poe Lock To All Marine Traffic At 6 P.m.